Project Management Life Cycle & Spiral Model: A Comprehensive Guide

Classified in Other subjects

Written at on English with a size of 2.75 KB.

Project Management Life Cycle

Project Initiation

During the project initiation phase, it is crucial for project champions to develop a thorough understanding of the project's important characteristics. Barry Boehm's W5HH principle summarizes the questions that need to be asked and answered to understand these characteristics.

Project Planning

Various plans are created during this phase:

  • Project Plan: Assigns project resources and time frames to tasks.
  • Resource Plan: Lists the resources, manpower, and equipment required to execute the project.
  • Financial Plan: Plans for manpower, equipment, and other costs.
  • Quality Plan: Outlines quality targets and control measures.
  • Risk Plan: Identifies potential risks, prioritizes them, and outlines actions to mitigate them.

Project Execution

  • Tasks are executed according to the project plan.
  • Monitoring and control processes ensure tasks are executed as planned.
  • Corrective actions are taken when deviations from the plan are detected.

Project Closure

  • Involves completing the release of all deliverables to the customer, along with necessary documentation.
  • Project resources are released, vendor agreements are terminated, and pending payments are completed.

Spiral Model in Software Development

The spiral model is similar to the incremental model, with a greater emphasis on risk analysis. It consists of four phases:

  1. Planning
  2. Risk Analysis
  3. Engineering
  4. Evaluation

A software project repeatedly passes through these phases in iterations called spirals.

Advantages of the Spiral Model

  • Enhanced Risk Avoidance: High amount of risk analysis reduces potential risks.
  • Suitable for Large Projects: Ideal for large and mission-critical projects.
  • Strong Control: Provides strong approval and documentation control.
  • Flexibility: Allows for the addition of functionality at a later stage.
  • Early Software Production: Software is produced early in the software development lifecycle.

Disadvantages of the Spiral Model

  • Costly: Can be an expensive model to implement.
  • Requires Expertise: Risk analysis demands specialized expertise.
  • Success Dependent on Risk Analysis: Project success hinges heavily on the effectiveness of the risk analysis phase.
  • Unsuitable for Small Projects: Not well-suited for smaller projects.