Commercial Production: Scripting, Acting, and Set Design

Classified in English

Written at on English with a size of 2.15 KB.

Introduction

What We Chose and Why

Our group chose to produce commercials because we believed it would leverage our knowledge and skills, enabling us to achieve optimal results.

Our Roles and Responsibilities

I took charge of scripting the commercials, participated as an actor, and set up the recording environment in my home.

Our Achievements

I successfully crafted a compelling script that blended my English proficiency with engaging and humorous content.

Body

Our Video Production

Our video comprises six commercials for various products and services, including an indestructible pencil, an energy drink, a deodorant, and a restaurant. We also included bloopers from the recording process, which were generally well-executed and organized.

My Contributions

I focused on creating an entertaining script that showcased each character's unique traits. I provided voice-over narration for one commercial and acted as a young man in the others.

My Responsibilities

My primary responsibilities included scriptwriting and setting up the recording environment according to the script's specifications, such as creating a restaurant setting at my home.

Strengths and Weaknesses

A key strength of our video lies in its editing, which ensured clear audio and a dynamic, engaging pace. However, a weakness was the group's pronunciation, as we are not native English speakers.

Limitations

Our production was constrained by time limitations due to early sunsets and the lack of specialized equipment.

Conclusion

English Language Considerations

As a group, we identified areas for improvement in our pronunciation.

Experience and Benefits

I thoroughly enjoyed this project as it provided me with an opportunity to express myself in English in public settings, where we conducted our recordings. The primary benefit was the ability to communicate freely and comprehend the content being discussed. The only recommendation I would make is to adjust the project timeline to avoid conflicts with the coef 2 calendar, which limited our availability.

Entradas relacionadas: