Air law
Classified in Other subjects
Written on in
English with a size of 3.37 KB
WORK: METHODS OF DEMOLITION IN Old Town and remote areas.
1. What is the difference between a throw and a demolition?
In a demolition that destroyed a building using brute force also means to destroy and demolish a building, but acting in a certain order.
2. Name and briefly describe the three main parts that make up a demolition project: Detailed report of the condition of the building affected by the work, and the system will be applied for the demolition, description of machines and tools that will intervene in the operation of work teams who will make and the corresponding term study of safety and hygiene. Maps at different scales of the situation and construction site, the plans and elevations, including the sections necessary for better understanding and detailed protective measures that are intended adoptar.Y thebudget, subject to due legal requirements.
3. What is the main source of security for staff in the work that is done to prevent contagion that may cause waste of the work?
Carry out disinfection and disinfestation of the building as both the land on which sits.
4. The entrance to the building to be demolished shall be protected against falling debris, riding a ______________ strong enough to withstand impacts of some weight.
Provisional visor.
5. What three main factors depends on the operation to evacuate the debris of the work?
Load capacity of trucks and their número.Delschedule established for such trabajo.De aid it may receive from other machines such as loaders and the like.
6. To gather at certain points accumulated debris, there is usually one of two systems: traditional or evacuator conduit system: Describe briefly each of them.
CLASSIC SYSTEM: Based on the opening of a gap in the cast to communicate with the ground immediately below.
DUCT SYSTEM EVACUATED: It integrates a series of prefabricated
7. Name at least four elements of personal safety equipment of an operator who works with manual machine tools (machine breakers, jackhammers, etc.): Old protector.Protectores of audición.Gafas of seguridad.Guantes of skin piel.Botas ancha.Chaleco rubber mold or yellow or orange (in case you have to work on the street or on the ground floor and near the driveway).
8. What is the most common vehicle bearing shears and grips for demolition work? The hydraulic excavator (both average), coupled with crushing machine.
9. What has two main functions of cooling (water jet or air) of diamond cutting tools? Avoid-or slow-warming of the tablet, which could lead to premature detachment of the pieces of particles diamante.Arrastrar concrete produced by the continuous rubbing.
10. He cites the types of recycling of waste resulting from demolition: No use ulterior.Con use total.Con partial use of parts of fragments íntegras.Transformación demolition (for grinding), for conversion into reusable materials.