Capacity Planning and Production Management Essentials
Understanding Capacity and Performance
Restriction: Factors limiting system performance and restricting production output.
Capacity: The maximum number of units an installation can receive or produce within a given period to meet demand.
Capacity Planning Horizons
- Short-term: Less than one year.
- Medium-term: 1 to 5 years.
- Long-term: Greater than 5 years.
Types of Capacity
- Planned Capacity: The ideal maximum theoretical yield of the production system design.
- Effective Capacity: The operating limits a company expects to achieve based on staff and equipment availability.
Performance Metrics
Utilization Rate: The percentage of design capacity reached. Calculated as: (Actual Output / Design Capacity) × 100%.
Efficiency: The percentage of effective capacity utilized. Calculated as: (Actual Output / Effective Capacity) × 100%.
Capacity Decision Strategies
- Contraction: A last-resort strategy involving plant closings, layoffs, or technical stoppages.
- Expansion: Increasing capacity through infrastructure investment or additional resources.
Process Planning Steps
- Calculate available capacity.
- Determine future needs (capacity cushion).
- Develop alternatives (contraction or expansion).
- Assess alternatives using economic methods and decision trees.
Key Operational Concepts
Capacity Cushion: Maintaining extra inventory to ensure customer loyalty and meet demand fluctuations. Recommended value: 100% - Utilization Rate.
Bottleneck: A constraint in process capability (can be internal or external).
Measurement Approaches:
- Based on Production: Useful for processes with low inventory or small variations.
- Based on Input: Used for flexible, low-volume processes with stable production requirements.
Principles of OCD for Production Maximization
- Balance the flow.
- Maximizing resource efficiency is not the only way to fix a system.
- Pay attention to hours lost within the system.
- Maintain inventory in front of bottlenecks and assembly points.
- Ensure system flow matches demand.
- Activating a non-bottleneck resource is different from utilizing a bottleneck resource.
- Evaluate all investments based on their impact on the entire system.
Scale Dynamics
Economies of Scale: The reduction in average unit cost as production rates increase, driven by fixed costs, construction, and material purchasing.
Diseconomies of Scale: The phenomenon where average cost per unit rises as plant size increases beyond an optimal point.